About cookies on this site Our websites require some cookies to function properly (required). In addition, other cookies may be used with your consent to analyze site usage, improve the user experience and for advertising. For more information, please review your options. By visiting our website, you agree to our processing of information as described in IBM’sprivacy statement. To provide a smooth navigation, your cookie preferences will be shared across the IBM web domains listed here.
Publication
EJOR
Paper
On practical resource allocation for production planning and scheduling with period overlapping setups
Abstract
Capacity requirements planning is normally based on long-term demand forecasts and part type mix estimates. In the execution of a production plan, it must often be recognized that the capacity assumptions previously made are no longer valid. This is because the part type mix, the operator or machine availability, or the existence of additional resources has changed. This may lead to underload as well as to overload situations for particular time periods. This paper presents a mixed 0-1 model and outlines a practical algorithm to schedule the production quantities. Our aproach takes into account all information available on the shop-floor level, such as: machine availability over the planning horizon, unit processing times for the part types, minor setup times (i.e., machine setups required when changing part types that belong to the same family), major setup times (i.e., machine setups required when changing part types that belong to different families), storable and non-storable resource availability and consumption, part type demand over the planning horizon, and bounds on production rate and backlogging. Furthermore, the model accounts correctly for costs corresponding to period overlapping setups. Also, the application of the model in some case studies is reported. © 1994.