Publication
Journal of Scheduling
Paper

Approximation algorithms for the joint replenishment problem with deadlines

View publication

Abstract

The Joint Replenishment Problem (JRP{\hbox {JRP}}JRP) is a fundamental optimization problem in supply-chain management, concerned with optimizing the flow of goods from a supplier to retailers. Over time, in response to demands at the retailers, the supplier ships orders, via a warehouse, to the retailers. The objective is to schedule these orders to minimize the sum of ordering costs and retailers’ waiting costs. We study the approximability of JRP-D{\hbox {JRP-D}}JRP-D, the version of JRP{\hbox {JRP}}JRP with deadlines, where instead of waiting costs the retailers impose strict deadlines. We study the integrality gap of the standard linear-program (LP) relaxation, giving a lower bound of 1.2071.2071.207, a stronger, computer-assisted lower bound of 1.2451.2451.245, as well as an upper bound and approximation ratio of 1.5741.5741.574. The best previous upper bound and approximation ratio was 1.6671.6671.667; no lower bound was previously published. For the special case when all demand periods are of equal length, we give an upper bound of 1.51.51.5, a lower bound of 1.21.21.2, and show APX-hardness.