Target-rate tracking for shale-gas multi-well pads by scheduled shut-ins?

View publication

Abstract

The recent success of shale-gas production relies on drilling of long horizontal wells and stimulation with multistage hydraulic fracturing. This practice normally leads to an initial peak production with a subsequent rate decline, followed by low and erratic production rates caused by water accumulation in the wells. Shale-gas recovery requires a large number of wells in order to maintain a sustainable total gas supply. To reduce the surface area disturbances caused by this extensive drilling and to share available surface infrastructure, the use of multi-well pads is a key driver in shale-gas developments. Furthermore, the inherent rate decline of shale-gas wells, the water accumulation in them and the large number of wells, leads to severe operational challenges for well operators. The fact that shut-ins may be used as a means to prevent liquid loading and boost late-life production rates from shale-gas wells, suggests scheduling of shut-ins to perform maintenance and clean-up of the wells, and to track a target rate for the multi-well pad. In this paper we propose an optimization scheme for shale-gas multi-well pads to schedule shut-ins and to track a target rate. The optimization problem is formulated as a discrete time mixed integer linear program (MILP) with binary variables defining at which times the well is either shut-in or producing. A reservoir proxy model and a well model for each well is designed and tuned against a realistic multi-fractured reservoir model. We demonstrate the benefits and the potential of the proposed methodology through a one-month production planning problem for an eight-well shale-gas pad. © 2012 IFAC.

Date

10 Jul 2012

Publication

ADCHEM 2012

Authors

Share