Feng Chen, Changrui Ren, et al.
ICWS 2011
Quay crane (QC) scheduling significantly affects the turn-around time of a container vessel, and it plays an important role in container terminal operation. Lee et al. (An approximation algorithm for quay crane scheduling with non-interference constraints in port container terminals, Presented at Tristan VI, Phuket, June 10–15, 2007) present a 2-approximation algorithm for QC scheduling problem with non-interference constraint. In this paper we revisit Lee’s heuristic for the scenario with small number of QCs, and prove that it is 4/3 and 5/3-approximation for the case with two QCs and the case with three QCs respectively.
Feng Chen, Changrui Ren, et al.
ICWS 2011
Miao He, Jinfeng Li, et al.
SOLI 2013
Feng Chen, Changrui Ren, et al.
IJCSS 2011
Jinfeng Li, Bing Shao, et al.
SOLI 2016