About cookies on this site Our websites require some cookies to function properly (required). In addition, other cookies may be used with your consent to analyze site usage, improve the user experience and for advertising. For more information, please review your options. By visiting our website, you agree to our processing of information as described in IBM’sprivacy statement. To provide a smooth navigation, your cookie preferences will be shared across the IBM web domains listed here.
Publication
CGO 2003
Conference paper
Integrated prepass scheduling for a Java just-in-time compiler on the IA-64
Abstract
We present a new integrated prepass scheduling (IPS) algorithm for a Java just-in-time (JIT) compiler which integrates register minimization into list scheduling. We use backtracking in the list scheduling when we have used up all the available registers. To reduce the overhead of backtracking, we incrementally maintain a set of candidate instructions for undoing scheduling. To maximize the ILP after undoing scheduling, we select an instruction chain with the smallest increase in the total execution time. We implemented our new algorithm in a production-level Java JIT compiler for the Intel Itanium processor. The experiment showed that, compared to the best known algorithm by Govindarajan et al., our IPS algorithm improved the performance by up to +1.8% while it reduced the compilation time for IPS by 58% on average.